400mm Full Screen With Countdown Timer is composed of three geometric units of red, yellow, and green or a combination of two geometric units of red and green. The color of the lamp body shell is black or yellow. The surfaces of the bottom case, front door cover, light-transmitting sheet, and sealing ring are smooth, and there are no defects such as missing materials, cracks, silver wires, deformations, and burrs. The surface has a strong anti-rust and anti-corrosion layer. The upper cover of the front door and the bottom case are snap-on and can be easily opened and closed with bare hands. The shell material is die-cast aluminum or engineering plastic.
Operating voltage | AC220V±20% |
Working frequency | 50Hz±2Hz |
Power factor | ≥0.9 |
Starting instantaneous current | <1A |
Startup response time | <25ms |
Close response time | <55ms |
Insulation resistance | ≥500MΩ |
Dielectric strength | Withstand voltage 1440 VAC |
Leakage current | ≤0.1mA |
Ground resistance | ≤0.05MΩ |
1. Our LED traffic lights have been made a great admiration of customers by high grade product and perfect after sales service.
2. Waterproof and dustproof level: IP55.
3. Product passed CE ( EN12368, LVD, EMC ), SGS, GB14887-2011.
4. 3 years warranty.
5. LED bead: high brightness, large visual angle, all the led made from Epistar, Tekcore, etc.
6. Housing of material: Eco-friendly PC material.
7. Horizontally or vertically light installation for your choice.
8. Delivery time: 4-8 workdays for sample, 5-12 days for mass production.
9. Offer free training on installation.
Q: Can I have a sample order for lighting pole?
A: Yes, welcome sample order for testing and checking, mixed samples available.
Q: Do you accept OEM/ODM?
A: Yes, we're a factory with standard production lines to fulfill different requirements from our clents.
Q: What about the lead time?
A: Sample needs 3-5 days, bulk order need 1-2 weeks, if quantity more than 1000 sets 2-3 weeks.
Q: How about your MOQ limit?
A: Low MOQ, 1 pc for sample checking available.
Q: How about the delivery?
A: Usually delivery by sea, if urgent order , ship by air available.
Q: Guarantee for the products?
A: Usually 3-10 years for the lighting pole.
Q: Factory or Trade company?
A: Professional factory with 10 years.
Q: How to ship the produt and deliver time?
A: DHL UPS FedEx TNT within 3-5 days; Air transportation within 5-7 days; Sea transportation within 20-40 days.